jaw crusher installation manual

    Date:  2016-10-18Author:  ZENITH

Jaw crusher installation should pay attention to the following:

1. As the jaw crusher work is a large vibration, the machine should be installed on the basis of concrete, in order to reduce vibration, noise and the impact of nearby buildings in the crusher and concrete foundation between the pad with hardwood, rubber Belt or other shock absorbing material.

2. Discharge trough to lay a layer of metal plate, and has a sufficient tilt angle, so as not to impede the smooth discharge of broken products.

3 jaw crusher discharge port regulation should be based on the required product particle size. T-bolt and tension spring should be released when adjusting. Use the jacking screw to adjust the seat, insert or remove the corresponding gasket, and then back to the top bolt, adjust the seat in the action of the role of self-weight, close to the rack ear seat, while the gasket group is pressed together. After that, adjust the spring pressure to ensure that the machine studio, the thrust plate and the thrust gasket close, but the pressure should not be too large, as long as few percussion can not happen, and finally lock the adjustment seat.

jaw-crusher

We are one of the biggest manufacturers in Aggregate Processing Machinery for the sand & gravel, quarry, mining, construction and recycling industries. Equipments include crusher, mobile crusher, complete crusher, feeding & conveying, screening & washing, track mounted mobile crusher, beneficiation equipment, grinding equipment, crushing equipment, jaw crusher, cone crusher, impact crusher, complete quarry plant, complete grinding plant. We provide personalized services to users in the Philippines.

We can provide a whole mining crushing production line all the equipment, you are welcome to contact our customer service, we will provide you with quality service.

 


Related Links:


Previous: jaw crusher operating manual

Next: spiral separate sand and chromite

chat online